MARCH 2020 SUCCESSFULLY DELIVERY OF “S.S. SAO GABRIEL”
Successfully delivery of the Design, Installation and Commissioning of the HVAC system of the river cruise vessels “S.S.SAO GABRIEL”.
Successfully delivery of the Design, Installation and Commissioning of the HVAC system of the river cruise vessels “S.S.SAO GABRIEL”.
Successfully delivery of the Installation and Commissioning of the HVAC system for the new Luxury expedition cruise vessel “WORLD EXPLORER” for Mystic Cruises.
GKM International Lda /G.K.Marine Ltd wined the contract for the supply, installation and commissioning of the HVAC system for two Luxury expedition cruise vessels, “WORLD VOYAGER” and “WORLD NAVIGATOR”,
Successfully delivery of the Design, Installation and Commissioning of the HVAC system for the new cabin areas of M/N “PASCAL LOTA”.
Successfully delivery of the Design, Installation and Commissioning of the HVAC system of the river vessel WS_C007 – M/V “EMERALD RADIANCE”.
Successfully delivery of the Design, Installation and Commissioning of the HVAC system of the river vessels WS_C006 – M/V “DOURO SERENITY” & WS_C005 – M/V “DOURO ELEGANCE”.
Successfully delivery of the Design, Installation and Commissioning of the new HVAC system of the passenger expedition vessel M/V “NATIONAL GEOGRAPHIC – ENDEAVOUR II”.
G.K. Marine Ltd was present at the large international shipping exhibition “Posidonia 2016”.
During the Holiday Season more than ever, our
thoughts turn gratefully to those who have
made our progress possible.
And in this spirit we say, simply but sincerely :
Thank You and Best Wishes for the
Holiday Season and a Happy New Year!
G.K.MARINE Ltd was present at the large international shipping exhibition Posidonia 2014.